Caption | German SdKfz. 9 halftrack vehicle towing a Panzer VI Tiger I heavy tank in preparation for Operation Zitadelle, near Kursk, Russia, Jun 1943 ww2dbase | ||||||||
Photographer | Altvater | ||||||||
Source | ww2dbaseGerman Federal Archives | ||||||||
Identification Code | Bild 101I-022-2926-11A | ||||||||
More on... |
| ||||||||
Photo Size | 800 x 564 pixels | ||||||||
Photos on Same Day | 20 Jun 1943 | ||||||||
Added By | C. Peter Chen | ||||||||
Licensing | Creative Commons Attribution ShareAlike 3.0 Germany License (CC BY-SA 3.0 DE).
See Bild 101I-022-2926-11A on Wikimedia Commons According to the German Federal Archive (Bundesarchiv), as of 21 Jul 2010, photographs can be reproduced with if these preconditions are met: - add the signature of the pictures and - of name of the originator, i.e. the photographer. ... You also can use fotos from the Federal Archives for free on Wikimedia Commons http://commons.wikimedia.org/wiki/Commons:Bundesarchiv Please contact us regarding any inaccuracies with the above information. Thank you. |
Did you enjoy this photograph or find this photograph helpful? If so, please consider supporting us on Patreon. Even $1 per month will go a long way! Thank you. Share this photograph with your friends: Stay updated with WW2DB: |
Visitor Submitted Comments
2. Bill says:
22 Feb 2015 04:31:21 PM
Another photograph I have identifies Tiger 114 being towed by same three Sd.Kfz.9s, looks like another photograph taken from the right side of the road.
22 Feb 2015 04:31:21 PM
Another photograph I have identifies Tiger 114 being towed by same three Sd.Kfz.9s, looks like another photograph taken from the right side of the road.
3. Tony Smith says:
20 Jun 2016 11:31:02 AM
Looks like there are 2 SdKfz. 9's pulling the tiger
20 Jun 2016 11:31:02 AM
Looks like there are 2 SdKfz. 9's pulling the tiger
4. Anonymous says:
8 Jul 2018 07:23:16 PM
I read once 200,000 man hours of labor went into a single tiger's construction. approx 2000 hours recorded by a single laborer working a 5 day 40 hour week. triple that and you have a 100 men working 4 months (3 shifts/day @ 5 days a week allowing 2 "off" days a week for disruptions)on a single tiger
8 Jul 2018 07:23:16 PM
I read once 200,000 man hours of labor went into a single tiger's construction. approx 2000 hours recorded by a single laborer working a 5 day 40 hour week. triple that and you have a 100 men working 4 months (3 shifts/day @ 5 days a week allowing 2 "off" days a week for disruptions)on a single tiger
All visitor submitted comments are opinions of those making the submissions and do not reflect views of WW2DB.
Search WW2DB
News
- » Wreck of USS Edsall Found (14 Nov 2024)
- » Autumn 2024 Fundraiser (7 Nov 2024)
- » Nobel Peace Prize for the Atomic Bomb Survivors Organization (11 Oct 2024)
- » Wreck of USS Stewart/DD-224 Found (2 Oct 2024)
- » See all news
Random Photograph
Current Site Statistics
- » 1,150 biographies
- » 337 events
- » 43,917 timeline entries
- » 1,241 ships
- » 350 aircraft models
- » 207 vehicle models
- » 375 weapon models
- » 123 historical documents
- » 260 facilities
- » 470 book reviews
- » 28,546 photos
- » 432 maps
Famous WW2 Quote
"An appeaser is one who feeds a crocodile, hoping it will eat him last."Winston Churchill
Support Us
Please consider supporting us on Patreon. Even $1 a month will go a long way. Thank you!
Or, please support us by purchasing some WW2DB merchandise at TeeSpring, Thank you!
18 Feb 2011 02:15:59 PM
CRIPPLED TIGER:
The two half-tracks towing Tiger 114 are the
Sd.Kfz.9s, known as (Famo) about 2500 were built. The German army used the vehicle for many different duties as a prime mover for the 24cm gun and the 8.8 flak 18.
It also doubled at times as a tank recovery vehicle, it had enough power to tow the Panzer Mk IV but, when needed to tow the Tiger, Panther or a King Tiger four Sd.Kfz were needed.
Tiger commanders were forbidden by regulation
to tow a crippled Tiger, the towing Tigers
engine would overheat, and led to breakdowns
you have the situation, where you lost two Tigers, but I'm sure crews didn't leave
a Tiger abandoned, and towed it under certain conditions.
THE BERGEPANZER-TIGER:
Three Bergepanzers were built in Sept. 1943
as Tiger Recovery Vehicles, equipped with
a derrick crane mounted in a center superstructure with rams, timber beams, towing chains, and other pioneer tools.
armed with one or two 7.92mm machine guns, but I'm sure crews carried what was needed and a lot of ammo to feed those machine guns.