
Caption | German SdKfz. 9 halftrack vehicle towing a Panzer VI Tiger I heavy tank in preparation for Operation Zitadelle, near Kursk, Russia, Jun 1943 ww2dbase | ||||||||
Photographer | Altvater | ||||||||
Source | ww2dbaseGerman Federal Archives | ||||||||
Identification Code | Bild 101I-022-2926-11A | ||||||||
More on... |
| ||||||||
Photo Size | 800 x 564 pixels | ||||||||
Photos on Same Day | 20 Jun 1943 | ||||||||
Added By | C. Peter Chen | ||||||||
Licensing | Creative Commons Attribution ShareAlike 3.0 Germany License (CC BY-SA 3.0 DE).
See Bild 101I-022-2926-11A on Wikimedia Commons According to the German Federal Archive (Bundesarchiv), as of 21 Jul 2010, photographs can be reproduced with if these preconditions are met: - add the signature of the pictures and - of name of the originator, i.e. the photographer. ... You also can use fotos from the Federal Archives for free on Wikimedia Commons https://commons.wikimedia.org/wiki/Commons:Bundesarchiv Please contact us regarding any inaccuracies with the above information. Thank you. |
Please consider supporting us on Patreon. Even $1 per month will go a long way! Thank you. Please help us spread the word: Stay updated with WW2DB: |
Visitor Submitted Comments
2.
Bill says:
22 Feb 2015 04:31:21 PM
Another photograph I have identifies Tiger 114 being towed by same three Sd.Kfz.9s, looks like another photograph taken from the right side of the road.

22 Feb 2015 04:31:21 PM
Another photograph I have identifies Tiger 114 being towed by same three Sd.Kfz.9s, looks like another photograph taken from the right side of the road.
3.
Tony Smith says:
20 Jun 2016 11:31:02 AM
Looks like there are 2 SdKfz. 9's pulling the tiger

20 Jun 2016 11:31:02 AM
Looks like there are 2 SdKfz. 9's pulling the tiger
4. Anonymous says:
8 Jul 2018 07:23:16 PM
I read once 200,000 man hours of labor went into a single tiger's construction. approx 2000 hours recorded by a single laborer working a 5 day 40 hour week. triple that and you have a 100 men working 4 months (3 shifts/day @ 5 days a week allowing 2 "off" days a week for disruptions)on a single tiger
8 Jul 2018 07:23:16 PM
I read once 200,000 man hours of labor went into a single tiger's construction. approx 2000 hours recorded by a single laborer working a 5 day 40 hour week. triple that and you have a 100 men working 4 months (3 shifts/day @ 5 days a week allowing 2 "off" days a week for disruptions)on a single tiger
All visitor submitted comments are opinions of those making the submissions and do not reflect views of WW2DB.
Search WW2DB
News
- » Wreck of M-49 Found (10 Apr 2025)
- » Japanese Emperor Visited Iwoto (Iwo Jima) (8 Apr 2025)
- » Race, Holocaust, and African-American WW2 Histories Removed from the US Naval Academy Library (7 Apr 2025)
- » US Government Plans to Purge WW2 Information (17 Mar 2025)
- » See all news
Current Site Statistics
- » 1,167 biographies
- » 337 events
- » 44,606 timeline entries
- » 1,243 ships
- » 350 aircraft models
- » 207 vehicle models
- » 376 weapon models
- » 123 historical documents
- » 261 facilities
- » 470 book reviews
- » 28,498 photos
- » 365 maps
Famous WW2 Quote
"Never in the field of human conflict was so much owed by so many to so few."Winston Churchill, on the RAF
Support Us

Please consider supporting us on Patreon. Even $1 a month will go a long way. Thank you!

Or, please support us by purchasing some WW2DB merchandise at TeeSpring, Thank you!
18 Feb 2011 02:15:59 PM
CRIPPLED TIGER:
The two half-tracks towing Tiger 114 are the
Sd.Kfz.9s, known as (Famo) about 2500 were built. The German army used the vehicle for many different duties as a prime mover for the 24cm gun and the 8.8 flak 18.
It also doubled at times as a tank recovery vehicle, it had enough power to tow the Panzer Mk IV but, when needed to tow the Tiger, Panther or a King Tiger four Sd.Kfz were needed.
Tiger commanders were forbidden by regulation
to tow a crippled Tiger, the towing Tigers
engine would overheat, and led to breakdowns
you have the situation, where you lost two Tigers, but I'm sure crews didn't leave
a Tiger abandoned, and towed it under certain conditions.
THE BERGEPANZER-TIGER:
Three Bergepanzers were built in Sept. 1943
as Tiger Recovery Vehicles, equipped with
a derrick crane mounted in a center superstructure with rams, timber beams, towing chains, and other pioneer tools.
armed with one or two 7.92mm machine guns, but I'm sure crews carried what was needed and a lot of ammo to feed those machine guns.